TEAK 520Material Orders

Order what the BOQ says. Track what reaches site.

Turn approved BOQ lines into purchase orders for board, laminate, hardware, tiles, glass and lights. Track what each vendor delivered, what was short, what went to which site and what came back as offcuts, so material spend stays inside the quote.

The utility room
Material OrdersRohit Sinha · 3 BHK
2 due
BWP ply 18 mm · 38 sheets
PO-221 · Gupta Plywood
Received
Acrylic shutters · 64 sq ft
PO-222 · Shutter Works
Received
Hinges and channels
PO-223 · Hardware dealer
92% received
Quartz counter · 11 rft
PO-224 · Stone Mart
40% received
Profile lights · 18
PO-225 · Lumen House
Ordered
How it runs

Four steps your studio already takes, done in one place.

01
Raise

Pick BOQ lines and the system builds purchase orders, grouped by vendor, with your agreed rates.

02
Approve

Orders above a set value go to the studio head before they are sent to the vendor.

03
Receive

The supervisor checks the delivery on site against the order, notes shortages and photographs the challan.

04
Reconcile

Ordered, received, used and wasted, compared to the quote for each project.

What’s inside

Built around how fit-out work actually happens.

POs from the BOQ

No retyping. Quantities and specifications come straight from the approved quote.

Vendor rate lists

Board dealers, hardware suppliers, glass and tile vendors with their current rates and credit terms.

Delivery tracking

Expected and actual delivery dates, so the carpenter is not waiting on site for board.

Factory and site stock

What sits at your workshop, what went to which flat and what is still due.

Wastage and offcuts

Log offcuts and reuse them on the next project before ordering fresh sheets.

Budget vs actual

Material cost per project against the quote, line by line, while the job is still running.

On a project

Carpentry materials, 3 BHK

Raised from the approved BOQ. The same project runs through every part of Exterinteriorz, from the first enquiry to the handover.

Material OrdersRaised from the approved BOQ
BWP ply 18 mm38 sheets ordered, 38 received
Acrylic shutters64 sq ft, delivered day 18
Hinges and channels1 short, re-ordered same day
Wastage3.5% against 5% allowed
Material spend₹6.1 L against ₹6.4 L quoted
Questions

About Material Orders

On the Gloss plan, vendors get a portal to confirm orders, share dispatch dates and upload invoices.

Yes. Raise a production order for your factory or an outsourced unit with panel lists from the BOQ.

Yes. Stock is held per workshop or store, and transfers between them are recorded.

Housewarming

Somewhere in your city, a flat is still bare plaster.

Its owner met a designer this morning. The studio that sends a clear, room-wise quote by evening usually gets the keys. Make that your studio.

QUOTATION · PROJECT 001Your next client
Free
  • Layout suggestionsincluded
  • Room-wise BOQincluded
  • Mood board linkincluded
  • Branded quotation PDFincluded
Amount payable$0
Quote your first project free Running more than one branch? Connect Team